What is Nirman for?
Nirman runs a general contractor's preconstruction, from pursuit to a guaranteed maximum price: track what you're chasing, estimate the work by division, bid it out to subs, level the bids, value-engineer, and buy the job out.
How is the GMP built up?
The guaranteed maximum price = trade estimate − accepted value engineering + GC contingency + GC fee. Nirman assembles it for you as you set the contingency and fee percentages, so the number you carry to the owner is always current.
What is bid leveling?
Comparing subcontractor bids on an apples-to-apples basis. Subs bid different scope, so you add an adjustment to normalize for gaps and exclusions; the leveled total is what you actually compare. Then you mark the sub you recommend awarding.
How do I split a line into labor, material, sub, equipment and other?
Open the line on the Estimate and click Split by cost type under the unit cost. Enter labor as hours per unit (times the division’s labor rate) or as dollars, then material, sub, equipment and other per unit. The unit cost becomes their sum, and the line shows how many labor hours it carries. Set a blended crew rate per division under Labor rates on the Estimate toolbar; changing a rate reprices every line priced in hours in that division (a line can use its own rate). The split shows on the Estimate bar, the Summary’s Cost types table, the spreadsheet’s Cost types view and the Excel export. Lines you don’t split count as Not split. Typing a unit cost removes the split.
Can a line’s quantity follow the building?
Yes. Open a line on the Estimate and pick Quantity from: Gross SF, Net SF, Units / keys, Parking stalls, Floors, Lot SF or another line’s quantity. Choose the levels (for example Level 2 to Level 8), then a × factor and + extra (3 doors per unit plus 4 spares). Each area its own gives every estimate area its own figure (Residential gets the residential GSF); One building total puts one number in one area, and you can pick which uses count. Edit as a formula lets you type one, like (GSF − NSF) × 2 + FLOORS. When the Areas tab changes, these lines update right away and the Estimate shows what moved. Typing a quantity turns the formula off for that line.
Can I put my company logo on documents?
Yes, it’s optional. Open Details on any pursuit and, under Your company, click Upload logo (PNG, JPG or SVG; white margins are trimmed for you). It shows on the bid tab PDF and Excel, the owner bid PDF, the owner’s bid form summary and in the top bar, on every pursuit. For a joint venture or another entity, click Different logo on this pursuit; Use your company logo switches back. Without a logo, documents show your company name.
How does the bid tab work?
Open a package in Bid leveling. Each bidder gets a column with the proposal date, company and contact. The rows follow a standard bid tab: base proposal (the scope lines every sub should cover), exclusions & conditions (permit fee, duration, working hours), price alternates and unit rates. Type an amount, a rate or a note in each cell, or one of INCLUDED, BY OWNER, TBD or EXCLUDED (TBD and EXCLUDED show in red). A TBD or EXCLUDED line in the base proposal is a scope gap. Tick Add on an alternate to put it in every bidder’s total. Add ALT / Deduct also holds your allowances, holds and deducts to cover gaps, so every sub is compared at full scope. If a sub sends an updated proposal, click Revised (the old one is kept as superseded and left out of the low bid); a second price from the same sub is an Option. Pick the bid with Use, add notes, then export the bid tab to Excel or PDF. Up to five bidders show on screen (two on a phone); the chips above the grid choose which, and the exports include all of them. A new bid tab offers Start with standard rows (mobilization, insurance, general conditions, permit, duration, working hours and more); Save these rows as my standard makes any bid tab’s rows your company’s list.
How does the subcontractor bid link work?
On Bidding, create one bid link per pursuit and send it to every sub. They don't need an account. For each package, click Scope & pricing to set the scope items subs must answer and the pricing lines they fill in (add a unit like LF or SF to also get an add-on unit price). Each sub picks a package, marks every scope item included, excluded or alternate, prices the schedule and uploads a proposal. RFIs are answered on the page for every bidder.
Where do link bids show up?
In Bid leveling, like any other bid: the base bid is the sub's total, and their base proposal lines are already filled in on the bid tab (INCLUDED, EXCLUDED or ALTERNATE), so excluded items show as gaps. A pricing comparison lines up every bid's line prices, unit prices, duration and exclusions. Add an allowance or hold under Add ALT / Deduct to level any gaps, then click Use on the sub to carry the number into Buyout / GMP.
What is bid coverage and why does it matter?
Coverage is how many real bids you have per package. Thin coverage — one or two bids on a scope — is pricing risk, because you can't tell if a number is competitive. Nirman flags packages that are still light.
What is value engineering?
Cost-reduction ideas — a cheaper assembly, a spec change, a resequence. Each item logs its savings and whether the owner accepted it. Accepted VE credits against the estimate and lowers the GMP.
What is the weighted pipeline?
Each pursuit's contract value × its win probability. Summed across all pursuits, it's a realistic backlog estimate — more useful than raw contract value because it discounts for the odds of actually winning.
Award versus buyout?
Award is selecting the sub for a package. Buyout is executing the subcontract that locks the price. The buyout progress shows how much of the awarded scope is actually under contract versus still exposed.
What do the share links do?
View — full read-only. Partner — a lighter external share. Copy — lets another Torana Labs user clone the project. Every link is revocable.
Does my work save automatically?
Yes — every edit autosaves to your account and syncs across devices. Sign in from the top-right to keep work across devices and enable sharing.